2026 Stakeholder Survey
The Independent Redress Mechanism (IRM) of the Green Climate Fund (GCF) conducted its 2026 Stakeholder Survey between 30 March and 1 May 2026, with the objective of assessing stakeholder perceptions of its work in 2025 and identifying opportunities to strengthen its performance. The report outlines the results of the survey.
Cover date
27 July 2026
Tipo de documento
